Univar

Industrial sector

Specialized contractor
Periodic maintenance
Year of completion: 2014-2015
Location: Salaberry-de-Valleyfield
Value of work: $790,000

Modernization work for their railcar unloading station (turnkey)


Challenges met

This was a design, manufacture and installation project. The person in charge of CNESST held a weekly main meeting, as well as three (3) daily meetings in order to prevent work accidents.

 


Project Description

Carry out mechanical process work:

  • Design and fabrication of a pumping station
  • Installation of a column pump
  • Design, fabrication and installation of a rack
  • Fabrication and installation of stainless steel piping with food grade welds
  • Design, fabrication and installation of piping on tanks
  • Design and construction of a storage garage
  • Design, fabrication and installation of an exterior aerial access walkway to the tank rows